Which tertiary switch can take over?

If primary and secondary root switches with priority 16384 both experience catastrophic losses, which tertiary switch can take over?

Question:

Which tertiary switch can take over?

Options:

a switch with priority 20480

a switch with priority 8192

a switch with priority 4096

a switch with priority 12288

Correct Answer

The Correct Answer for this Question is

a switch with priority 20480

Leave a Comment